AGRICULTURE
Idaho Power and Rocky Mountain Power coordinate the location of transmission line structures to reduce potential impacts to farmlands.
|
Idaho Power and Rocky Mountain Power can often vary the location or height of towers, or the span length between structures, to accommodate plowing and harvesting.
|
Towers can be sited to avoid irrigation pivots and be located outside of a pivot-irrigation system’s spray area.
|
Agricultural operations near a double-circuit, 230 kV transmission line east of Payette, Idaho.
|
Pivot-irrigation system operating under a 138 kV transmission line near Ontario, Oregon.
|
Agricultural use under a double-circuit, 230 kV transmission line east of Payette, Idaho.
|




